# Council Decision of 13 November 2012 on the signing and conclusion of the Agreement between the Government of the United States of America and the European Union on the coordination of energy-efficiency labelling programmes for office equipment (Text with EEA relevance) (2013/107/EU), Division (d): Measurement Procedures


To measure time, an ordinary stopwatch and timing to a resolution of one second is sufficient. All energy figures are to be recorded as watt-hours (Wh). All time is to be recorded in seconds or minutes. 'Zero meter' references are to the 'Wh' readout of the meter. Tables 6 and 7 outline the steps of the TEC procedure.
Service/maintenance modes (including colour calibration) should generally not be included in TEC measurements. Any such modes that occur during the test are to be noted. If a service mode occurs during a job other than the first, that job may be dropped and a substitute job added to the test. If a substitute job is needed, do not record the energy values for the dropped job and add the substitute job immediately after Job 4. The 15-minute job interval is to be maintained at all times, including for the job that is dropped.
MFDs without print capability are to be treated as copiers for all purposes of this test procedure.

---
Source: https://www.legislation.gov.uk/eudn/2013/107/schedule/ANNEX C/division/III./division/D./division/2./division/(d) (the official version)
Page: https://openlegislation.uk/eu-decision-2013-107/schedule-ANNEX C/division-III./division-D./division-2./division-(d)
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

